Rémi Landreau
Consultant.
Consultant for an engineering and operational consulting company: AGAP2.
You can also find me here: http://www.linkedin.com/profile/edit?trk=hb_tab...
Currently working for GE Oil and Gas - Thermodyn as Field Engineer on steam turbine.
I can read speak and write in English.
I can read, understand and speak Spanish a bit.
2011 - 2011From December 2011 and still ongoing.
GE Oil and Gas : Thermodyn.
Steam turbine starting engineer for field Service.
http://site.ge-energy.com/businesses/ge_oilandg...
Spain: http://www.puertoerrado2.com/home/
Senegal: http://www.css.sn/usine.php3
March - July 2011
Support mission to Fives Solios group.
http://www.qatalum.com/Pages/Home.aspx
+Optimizing a paste plant process (Pitch anodes for aluminium plant) in Doha - Qatar.
+Working on warranty point for Qatari company QATALUM.
+Performance test.
2011 - 2011Operation support for production.
Nitric acid plant. "Grande Paroisse Bi-Pression" process. (GPN)
- Loos boiler "smoke tube".(25t/h at 20 bar)
- ammonia storage, 1700t.
- Operation on turbo group Aescher-Wyss/Oerlikon with a steam turbine, NOX gas turbine, NOX gas compressor and air compressor (single shaft)
- Ancillary of plant.
2006 - 2010About project : Pre-commissioning, commissioning, start up and operation.
Ancillaries department. Management and training of 10 Operators Team.
Procedures development. Punch List feedback to construction team.
Trouble shooting about malfunction.
Work:
- Units Translation of technical books and functional descriptions from English to French.
- Development and writing of operational instructions and working procedures.
- Pre-commissioning and commissioning from central control room and field.
- Checking all automatic setups. Modification with feedback from tests.
- SWAT (Soft-Ware Acceptance Test) about anhydrous ammonia storage and distribution. system. Safety point review, control screen (ABB Process Control System).
- Modification / Upgrade of working procedures.
- Checking Automatics sequences with SAMA DRAWA. HAZOP procedures added.
- Training probationer central control room operator (3) and field operators (8).
- Ancillaries department normal operations.
- Scheduled and emergency maintenance management with Ellipse system.
- Fire detection management, and first reaction with emergency response team.
- Tracking bugs and upgrade control loops with TaiJi PID from MATRIKON System.
- Isolation units and training activities.
- Tags all units of ancillaries department.
Activities and units started:
ORACLE ENGINEERING: Oil Fired Steam power plant
-3 x 85tph oil fired boilers (6400 kPag & 485 Deg C), each with a flue gas scrubber for particulate and SO2 removal. Boilers were upgraded to meet revised emission levels for Nox, Sox, particulate and CO. This involved retrofitting new fans and particulate scrubbers; modifying the economiser to install selective catalytic reduction equipment; adding an anhydrous ammonia storage and distribution system for injecting ammonia into the boiler furnace and flue gas stream. (I did the SWAT review for this upgrade)
- 2 x 20MW steam turbines, with controlled extraction and admission steam systems.
- Exhaust steam condensing system and cooling towers.
- Micro filtration (4 x 170m3/hr train) and demineralised (3 x 155m3/hr train) water treatment plant.
- Boiler feed water system, HP feed pumps, deaerator, condensate system.
- MP steam system, contaminated steam from the HPAL process is converted to clean steam through a series of evaporators. The steam is then used by the process or as admission steam to the turbine and the 'dirty' condensate returned to the process.
- Integrated steam system with pressure reducing and desuperheating station for MP an LP process steam requirements and turbine bypass systems.
- HV & LV electrical systems, transformers, switchrooms, motor control command.
- Heavy Fuel Oil storage and distribution system, pumping and heating unit.
OUTOTEC: Sulfuric Acid plant (98%), (4500 t/day).
- Gas Source: Elemental Sulphur
- Sulfur burning system process with power recycled from oxidation reaction into Vanadium Pentoxide 4 stages converter. Oxidation reaction energy supply a steam drum (285t/h steam at 6500 kPa Working pressure)
- Sulfur melting and filtration unit.
- SO2 Unit which supply neutralization unit. (2 x25 mtpd liquid SO2)
- Cooling towers
Lime Kiln and Hydtration Unit: 989 000t/year of hydrated lime
- Na2CO3 production
- Hydrated lime
- Limestone stock unloading and management (SANDVIK Stacker)
Solid bulk handling system with conveyors and Stacker (SANDVIK: 1400 t/h), for coal, limestone and sulfur.
Raw, process and fire water supply system.
Few Co workers from different specialty during the project :
-SNC LAVALIN; Jean-François Houle: DEVWEB operation training program.
-ORACLE Engineering; Robin Wilson, Glen Evans: Oil Fired Steam Power Plant.
-Goro Construction Team and SANDVIK: conveyors + Stacker commissing.
2005 - 2005Operation trainee (2 months)
- Work on Goro Nickel Project process plant.
- Focused work on High Pressure Acid Leaching units (HPAL)
- Job safety Analysis (JSA) and Leaching department working procedures writing activities.
- Isolation study to write isolation procedure.
2004 - 2004- Study of different unexplored areas of Koniambo Mountain.
- Multiple Limonite sample analysis